Location: Tigard, OR
Completion: Beginning of 2019
Owner: Tigard School District
Project Manager: Sam
Salesman: Chris
Foreman: Scott
Field Operation Manager: Chris
Product Installed: Taylor Metals Versa Span 22 gauge Standing Seam Panel
Safety Installed: Retractable roof hatch railing system
Size: 15,000 SqFt
Recognizable Landmarks Nearby: Tigard High School
What is the building used for?
Alternative School for high school.
What were the issues we solved?
Excellent long term roof for a new building. Careful planning allowed for installation of a solar panel system without affecting the roof warranty. The building required a Net Zero rating and we were able to achieve the thermal and air tight characteristics that this required.
How long will this system last?
40 years at least.
Will they see any savings in utility bills?
Yes!
Crew size?
6-8
Special timeline requirement?
Roof had to be complete before interior finishing’s and drywall could be installed.