Location: 845 Willow Avenue Long Beach, CA 90755
Completion: February 2015
Owner: 2H Construction
Product Installed: .60 Mil PVC over Full Tapered System
Size: 85 squares
What is the building used for?
This is a new medical office building, 2 story
What were the issues we solved?
Complete drainage of the roof through a taper
How did the products solve those issues?
The taper system directed the water to the drains
How long will this system last?
20+ years
Will they see any savings in utility bills?
We installed an average R Value of R-30
Crew size?
6